The Software (SW) for self-service devices is developed in an integrated manner, considering all business aspects of the Customer’s company activity.
ENGY POST Software has a modular structure that permits to expand software functionality as required and according to financial opportunities of the Customer.
Our company develops Software for the full range of manufactured products:
Multipurpose Information-Payment Terminals
Parcel Terminals (Parcel Lockers, Post Terminals)
Deposit Machines
Banking Equipment
Software Development Stages
1
Technical Enquiry on Software (TE)
On this stage we make analysis of functional and technical requirements described in the TE on the SW.
ENGY Company specialists can help in definition of the requirements and development of TE on SW, if your company doesn’t have any precise formalized requirements.
2
Graphic Interface Design (GUI)
After SW analysis and understanding functional requirements to the system it is developed functional GUI prototype.
On the bases of GUI prototype and Customer’s brand-book goes development of the graphic interface design.
3
Development
At this stage there is a development of system program code, integration mechanisms and binding of system working logic to the graphic interface.
4
Testing
After development stage, SW and integration mechanisms pass tests for identification of mistakes in a program code and on compliance to functional requirements.
5
Release and Piloting
Mistakes and discrepancies revealed at the Testing stage are eliminated, repeated testing of the product is carried out and after that a stable SW release, ready for operation is issued.
Further the operational phase of the system begins at which the revealed errors and inaccuracies are eliminated within guarantee obligations.
Process of the software development goes in several directions
creation of the “Terminal client” – the program of management of all devices/mechanisms inside the terminal
development of the XFS-drivers for terminal’s devices
development of the “Remote Monitoring System” – the program necessary for remote control and monitoring of terminals’ state
development of the “Server software” – the software necessary for information exchange between terminals and server, data processing and storage
The average term of development of the project/hardware-software complex “from scratches” is from 60 to 120 calendar days.
More precise terms are defined by our project managers at a stage of presenting by the Customer of TE on development of the SW or on hardware-software complex.
Guarantee obligations on developed software
All functional failures, bugs, logical, spelling and other errors revealed in system operation are eliminated on a grant basis within 1 calendar year, starting from the moment of signing of the acceptance Act.
Exclusive and non-exclusive rights on the Software
It is possible to purchase as exclusive rights on the SW (an initial code), and non-exclusive rights on the SW (purchase of licenses).
Request a price list
Leave your question and contact details. Our manager will contact you to clarify the details
Запрос прайс-листа
Оставьте свой вопрос и контактные данные. Наш менеджер свяжется с вами для уточнения деталей
Send a request
Leave your question and contact details. Our manager will contact you to clarify the details
Оставить заявку
Оставьте свой вопрос и контактные данные. Наш менеджер свяжется с вами для уточнения деталей